Skip to main content
Version: 1.0.0

Duplicate test jdbc

Copy test jdbc from JDBC Library. When copying a jdbc test, all information, both configuration and description, is copied:

Step 1: Click the button alt text corresponding to the Test JDBC you want to duplicate, then select “Duplicate”

alt text

Step 2: All information fields in the “Duplicate test jdbc” screen will be copied, referring to the fields in the section Tạo mới một jdbc.

alt text

Exceptions:

Field NameMandatoryFormatConstraintsDescription
Tab General information
Basic Information
CodeNoTextIf entered, the Code must be unique, at least 2 characters long, start with a letter, and contain only a-z (lowercase, uppercase), digits, "_" and "-".The code of the duplicated project will be automatically changed to “copy_of_” + the original project’s code. Users can edit or leave it blank for the system to generate it as T-STT (e.g., T-1).
NameYesTextThe name of the duplicated project will be automatically changed to “copy_of_” + the original project’s name. Users can edit it.
Metadata Configuration Information
ProjectYesComboboxDisplays the list of projects the user is involved in. It’s possible to duplicate a scenario from different projects. Only one value can be selected.
StatusYesComboboxAllows the user to select one of three values: Draft/Active/Review.
Workflow StatusYesComboboxAllows the user to select one of four values: Draft/Reject/Active/Review.

Step 3: Click “OK”

The duplicated Test JDBC will be added to the JDBC library of the selected project.